CyrusOne broke ground on its sixth San Antonio data center (SAT6) at 14719 Omicron Drive in February 2025. The two-building campus totals 276,000 sq ft with 36 MW of IT capacity. The SAT6 campus is located directly south of the existing SAT5 facility in the Texas Research Park. CyrusOne's cumulative capital investment in San Antonio now approaches $1 billion.

Water Impact

Daily water use (estimated range)

324K – 468K gal/day

Water returned per day

None reported

Per Estimated from 36 MW using LBNL benchmark 9,000–13,000 gal/day/MW, based on MW benchmark at WUE 1.8–2.5 L/kWh, 80% utilization

Estimated daily water use324K – 468K gal/day

vs. 5M gal/day (typical 400 MW facility)

The higher estimate is equivalent to the daily water use of approximately 4,680 households. San Marcos has approximately 25,000 households.

Water intake
324K – 468K gal/day
Lost to evaporation
100%
Returned to system
0% (None reported)
Water flow: 324K – 468K gal/day enters the facility per day. Approximately 100% (468K gal/day) is lost to evaporative cooling and cannot be recovered. No return flow is reported.
For comparison: A sustainable seawater-cooled data center can return over 95% of water to the system. A typical land-based evaporative cooling tower loses 80–95% to evaporation — the primary method used in Texas.

Direct water figures are estimates from permit applications and developer disclosures. Indirect (power generation) figures are calculated estimates. Actual water use depends on technology choices, operating capacity, and weather conditions.

Location

Address: 14719 Omicron Drive, San Antonio, Bexar County, TX

Edwards Aquifer Recharge Zone:YES — IN RECHARGE ZONE

Distance to aquifer edge: 0 miles

Water source: SAWS

Loading map…

Infrastructure

Water provider
SAWS
Power provider
CPS Energy / ERCOT

This project needs your attention.

Government Review

This is the decision window — showing up now makes the biggest difference

Elected officials weigh in-room presence directly. Twenty people attending a hearing shifts the political calculus more than 200 email signatures. This is also your legal window to create an official record of community opposition, which matters in any subsequent appeal.

Timeline

  1. February 3, 2025

    CyrusOne breaks ground on fifth San Antonio campus at Texas Research Park

    CyrusOne held its official groundbreaking ceremony on February 3, 2025 for its fifth San Antonio data center campus at Texas Research Park. The new campus features two buildings totaling 276,000 sq ft with 36 MW of IT capacity. Attendees included Bexar County Judge Peter Sakai, District 6 and 7 City Councilwomen, and Greater San Antonio Chamber CEO Jeff Webster.

    Source →(opens in new tab)
  2. February 3, 2025

    Data Center Dynamics covers CyrusOne fifth campus groundbreaking

    Data Center Dynamics reported on CyrusOne's February 3, 2025 groundbreaking at Texas Research Park, covering the 36 MW, two-building, 276,000 sq ft campus and noting CyrusOne's cumulative ~$1 billion investment in San Antonio since 2012.

    Source →(opens in new tab)
  3. July 18, 2024

    Community Impact covers CyrusOne as part of San Antonio tech sector data center growth

    Community Impact published coverage noting CyrusOne's presence alongside Stream Data Centers as part of the accelerating data center build-out on San Antonio's far West Side near Texas Research Park and Westover Hills.

    Source →(opens in new tab)
  4. November 10, 2023

    TDLR permit filed for CyrusOne SAT 8 & 9 at 14815 Omicron Drive (TABS2024005161)

    CyrusOne filed TDLR permit TABS2024005161 on November 10, 2023 for SAT 8 & 9 at 14815 Omicron Drive — a 279,730 sq ft two-story data center and office building with four data halls. Scheduled April 2024 – December 2025; estimated cost $15 million. This is the next expansion phase directly south of SAT5 on the Texas Research Park campus.

    Source →(opens in new tab)
  5. April 29, 2021

    TDLR permit filed for CyrusOne SAT VI TRP2 — $50M, 132,070 sq ft (TABS2021014441)

    CyrusOne filed TDLR permit TABS2021014441 on April 29, 2021 for SAT VI TRP2 at 14719 Omicron Drive — a 132,070 sq ft two-story data center and 19,895 sq ft office building. Scheduled start July 1, 2021; completion April 30, 2022; estimated cost $50 million. This filing corresponds to the SAT6 building on the Texas Research Park campus.

    Source →(opens in new tab)

Documents

Sources

  1. 1. CyrusOne breaks ground on San Antonio data center in Texas Research Park — Data Center Dynamics, 2025-02-03. Link →(opens in new tab)
  2. 2. CyrusOne Breaks Ground on Fifth Data Center Campus in San Antonio — CyrusOne, 2025-02-03. Link →(opens in new tab)
  3. 3. Data center groundbreaking reflects tech business growth in San Antonio — Community Impact, 2024-07-01. Link →(opens in new tab)

Community Notes

Located in the Texas Research Park cluster on Omicron Drive in west Bexar County, on the Edwards Aquifer recharge zone. The Omicron Drive corridor is becoming one of the densest data center zones in Texas, with CyrusOne, Vantage TX12, and CloudHQ all operating within approximately one mile of each other.