Under ConstructionEngageReview in progress — 4 sources cited

Proposed size

96 MW

Site area

89 ac

Building area

432,800 sq ft

Cooling

Closed-loop liquid-to-liquid cooling (near-zero WUE claimed)

Investment

$0.3B

Developer

Vantage Data Centers

Vantage Data Centers filed plans to build TX12 at 17420 Omicron Drive in west Bexar County, adjacent to its existing TX1 campus in the Texas Research Park corridor. The two-story, 432,800 sq ft facility will deliver up to 96 MW of AI-focused critical IT capacity. Construction began October 2025; as of February 2026, the project entered tenant fit-up phase. Notable for closed-loop liquid cooling architecture supporting rack densities up to 100 kW.

Water Impact

Daily water use (estimated range)

864K – 1.2M gal/day

Water returned per day

None reported

Per Estimated from 96 MW using LBNL benchmark 9,000–13,000 gal/day/MW. Developer claims near-zero WUE via closed-loop liquid cooling., based on MW benchmark at WUE 1.8–2.5 L/kWh, 80% utilization. Actual consumption likely far lower if closed-loop claim is verified.

Estimated daily water use864K – 1.2M gal/day

vs. 5M gal/day (typical 400 MW facility)

The higher estimate is equivalent to the daily water use of approximately 12,480 households. San Marcos has approximately 25,000 households.

Water intake
864K – 1.2M gal/day
Lost to evaporation
100%
Returned to system
0% (None reported)
Water flow: 864K – 1.2M gal/day enters the facility per day. Approximately 100% (1.2M gal/day) is lost to evaporative cooling and cannot be recovered. No return flow is reported.
For comparison: A sustainable seawater-cooled data center can return over 95% of water to the system. A typical land-based evaporative cooling tower loses 80–95% to evaporation — the primary method used in Texas.

Direct water figures are estimates from permit applications and developer disclosures. Indirect (power generation) figures are calculated estimates. Actual water use depends on technology choices, operating capacity, and weather conditions.

Location

Address: 17420 Omicron Drive, San Antonio, Bexar County, TX

Edwards Aquifer Recharge Zone:YES — IN RECHARGE ZONE

Distance to aquifer edge: 0 miles

Water source: SAWS

Loading map…

Infrastructure

Water provider
SAWS
Power provider
CPS Energy / ERCOT

This project needs your attention.

Under Construction

Permitted — the decision is made, but conditions still matter

The primary decision cannot be undone, but the conditions attached to the approval can still be negotiated or enforced. Officials can be held accountable for permit violations. Community pressure matters for shaping how the project is operated and what monitoring is required.

Timeline

  1. April 20, 2026

    Vantage TX12 listed on datacentermap.com: 96 MW, 432,800 sq ft, $276.8 M

    datacentermap.com confirms a 2-story, 432,800 sq ft facility delivering up to 96 MW of critical IT capacity with a $276.8 M investment. Construction Oct 2025–Aug 2027.

    Source →(opens in new tab)
  2. February 23, 2026

    TX12 enters open fit-up phase — 96 MW tenant build-out underway

    As of February 23, 2026, Vantage TX12 entered its open fit-up phase involving tenant build-out of 96 MW of high-density data modules. The facility features liquid-to-liquid cooling and is significantly pre-leased. Phase 1 commissioning targeted Q4 2026.

    Source →(opens in new tab)
  3. October 14, 2025

    Construction begins on Vantage TX12 at 17420 Omicron Drive

    Per TDLR permit records, construction on Vantage TX12 at 17420 Omicron Drive officially started October 14, 2025. The 432,800 sq ft, 96 MW building is scheduled for completion August 31, 2027 at an estimated cost of $276.9 million.

    Source →(opens in new tab)
  4. January 1, 2025

    Data Center Dynamics reports Vantage filing for TX12 — 96 MW, $276.9M

    Data Center Dynamics covered Vantage's TDLR filing for TX12 at 17420 Omicron Drive — a 432,800 sq ft, 96 MW two-story building with an estimated cost of $276.9 million. The article noted Vantage's growing TX1 campus in the Texas Research Park corridor.

    Source →(opens in new tab)
  5. November 22, 2023

    TDLR permit filed for Vantage TX21 core, shell, and 16 MW fit-out (TABS2024005974)

    Vantage Data Centers filed TDLR permit TABS2024005974 for a three-story data center at 5207 Rogers Road (TX21), registered November 22, 2023. Construction scheduled December 11, 2023 – June 1, 2025; estimated cost $157 million. TX21 is the sister building to TX22 on the Rogers Road sub-campus.

    Source →(opens in new tab)
  6. August 31, 2023

    Vantage acquires 89 acres from UT System on San Antonio's far West Side

    Vantage Data Centers purchased two parcels totaling approximately 89 acres in the Westover Hills area from the University of Texas System, adjacent to SeaWorld and near State Highway 151. The acquisition established the TX1 campus footprint that would host TX11, TX12, and subsequent buildings.

    Source →(opens in new tab)

Documents

Sources

  1. 1. Vantage files to build second San Antonio data center in Texas — Data Center Dynamics, 2025-01-01. Link →(opens in new tab)
  2. 2. Vantage Planning $276.9M San Antonio Data Center — Connect CRE, 2025-01-01. Link →(opens in new tab)
  3. 3. Denver data center company buys 89 acres on far West Side — San Antonio Report, 2023-08-01. Link →(opens in new tab)
  4. 4. Vantage TX12 - San Antonio — datacentermap.com, 2026-04-20. Link →(opens in new tab)

Community Notes

Located on the Omicron Drive corridor in the Edwards Aquifer recharge zone. Vantage acquired the land from the UT System Board of Regents in July 2023. The closed-loop cooling design, if verified, would meaningfully reduce evaporative water consumption compared to traditional tower-cooled facilities.