Vantage Data Centers TX22

Under ConstructionEngageReview in progress — 3 sources cited

Building area

214,525 sq ft

Investment

$0.3B

Developer

Vantage Data Centers

Vantage filed plans to build TX22 at 5207 Rogers Road in San Antonio, adjacent to its TX21 facility. The two-story, 214,525 sq ft data center is a $272 million investment. Construction is scheduled October 2025 through June 2027. The facility is optimized for hyperscale cloud and AI infrastructure.

Water Impact

Daily water use (estimated range)

Unknown

Water returned per day

None reported

Per MW capacity not publicly confirmed; water estimate requires MW figure, based on Filed with TDLR; MW capacity not yet disclosed in public filings

Estimated daily water useUnknown

vs. 5M gal/day (typical 400 MW facility)

Water intake
Unknown
Lost to evaporation
100%
Returned to system
0% (None reported)
Water flow: Unknown enters the facility per day. Approximately 100% (1M gal/day) is lost to evaporative cooling and cannot be recovered. No return flow is reported.
For comparison: A sustainable seawater-cooled data center can return over 95% of water to the system. A typical land-based evaporative cooling tower loses 80–95% to evaporation — the primary method used in Texas.

Direct water figures are estimates from permit applications and developer disclosures. Indirect (power generation) figures are calculated estimates. Actual water use depends on technology choices, operating capacity, and weather conditions.

Location

Address: 5207 Rogers Road, San Antonio, Bexar County, TX

Edwards Aquifer Recharge Zone:YES — IN RECHARGE ZONE

Distance to aquifer edge: 0 miles

Water source: SAWS

Loading map…

Infrastructure

Water provider
SAWS
Power provider
CPS Energy / ERCOT

This project needs your attention.

Under Construction

Permitted — the decision is made, but conditions still matter

The primary decision cannot be undone, but the conditions attached to the approval can still be negotiated or enforced. Officials can be held accountable for permit violations. Community pressure matters for shaping how the project is operated and what monitoring is required.

Timeline

  1. October 1, 2025

    Construction starts on Vantage TX22 — $272M, 214,525 sq ft

    Vantage TX22 construction began in October 2025 at 5207 Rogers Road, adjacent to the completed TX21 building. The 214,525 sq ft two-story building represents a $272 million investment and is scheduled for completion June 2027. Design firm: Corgan.

    Source →(opens in new tab)
  2. June 1, 2025

    Vantage TX21 reaches substantial completion

    Vantage TX21 at 5207 Rogers Road reached its TDLR-scheduled completion date of June 1, 2025, becoming the anchor building of the Rogers Road campus. TX21 is a three-story, 360,000 sq ft data center; its completion directly preceded the start of adjacent TX22 construction.

    Source →(opens in new tab)
  3. January 1, 2025

    Data Center Dynamics covers Vantage TX22 TDLR filing

    Data Center Dynamics reported that Vantage filed to build TX22 at 5207 Rogers Road — a 214,525 sq ft two-story building adjacent to the TX21 campus. The $272 million project is designed for wholesale, hyperscale, and high-density colocation with Tier III+ reliability.

    Source →(opens in new tab)
  4. November 22, 2023

    TX21 TDLR permit filed — 3-story, 360,000 sq ft, $157M (TABS2024005974)

    Vantage filed TDLR permit TABS2024005974 for TX21 at 5207 Rogers Road on November 22, 2023. Construction scheduled December 11, 2023 – June 1, 2025; estimated cost $157 million. TX21 is the first building on the Rogers Road campus and directly precedes TX22 on the same site.

    Source →(opens in new tab)

Documents

Sources

  1. 1. Vantage files to build another data center in San Antonio, Texas — Data Center Dynamics, 2025-01-01. Link →(opens in new tab)
  2. 2. Vantage TX22 - San Antonio Data Center | 5207 Rogers Rd — Data Center Map, 2026-04-15. Link →(opens in new tab)
  3. 3. Vantage TX22 - San Antonio — datacentermap.com, 2026-04-20. Link →(opens in new tab)

Community Notes

Part of the Rogers Road data center cluster in west Bexar County, near the Edwards Aquifer recharge zone. TX21 (adjacent building) completed June 2025 at $157 million. Combined TX21+TX22 represents over $400M in investment in close proximity to recharge-zone land.